2,934 New PMP Id 1028 project management is concerned with managing which type of project Questions & Answers with explanation

2351.
A control chart should always contain:
Select one
2352.
When is Rolling Wave Planning useful in a project?
Select one
2353.
Which of the following is not a PMBOK Knowledge Area?
Select one
2354.
A project manager is managing a research project. Typically, research projects are not clearly defined and involve a lot of uncertainty. The project has four phases in which a phase can only start when its previous phase is complete. What project lifecycle and phase-to-phase relationship should the project manager use for this project?
Select one
2355.
The transition from one phase to another within a project's lifecycle (e.g., from design to manufacturing) is typically marked by:
Select one
2356.
The resource optimization technique during the Control Schedule process allows a project manager to:
Select one
2357.
Which of the following is an enterprise environmental factor?
Select one
2358.
Estimating the type and quantities of material, people, equipment, and supplies required to perform each activity is:
Select one
2359.
Projects operating in agile environments where a high degree of uncertainty exists and where the scope is not yet fully defined, may not benefit from detailed cost calculations due to frequent changes. Instead, lightweight estimation methods can be used to generate a fast, high-level forecast of project labor costs, which can then be easily adjusted as changes arise. Detailed estimates are:
Select one
2360.
The technique of comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance is known as:
Select one