2,934 New PMP Id 1028 project management is concerned with managing which type of project Questions & Answers with explanation

2551.
Projects with adaptive life cycles use product backlogs to define a project’s scope. The product backlog is a set of:
Select one
2552.
What is the process of random selection and inspection of a work product?
Select one
2553.
Which of the following processes are usually not performed continuously, but rather, performed periodically as needed:
Select one
2554.
You have a contract to build a manufacturing plant in Kuala Lumpur. However, you are not familiar with the building codes in Kuala Lumpur or Malaysia, so you are reviewing all their building codes prior to “turning a shovelful of earth.” This is an example of:
Select one
2555.
An automotive designer uses a certain technique to determine which combination of suspension and tires will produce the most desirable ride characteristics at a reasonable cost. To do this, the designer employs a statistical framework and systematically changes all the important parameters instead of changing the factors one at a time. This method is known as:
Select one
2556.
You are a non-technical project manager. Two highly skilled and knowledgeable resources on your project are in conflict over the best technical solution to meet a project requirement. However, this is not affecting the project schedule. Who is initially responsible for the conflict resolution?
Select one
2557.
Which of the following are the tools and techniques used in both the Plan Communications Management and Manage Communications processes?
Select one
2558.
A project manager presented earned value analysis data in a tabular format in a performance report. Another way the project manager could have presented the earned value analysis data is with:
Select one
2559.
David was required to investigate a business problem and describe the higher-level needs of the business as a whole. David’s final reports describes in detail the features, functions and characteristics of the product that will meet the business and stakeholder requirements. What is wrong with David’s report?
Select one
2560.
A project manager from a buyer organization is invited to lunch by the manager of a seller organization. The project manager's organization does not permit receipt of gifts from vendors. The project manager should:
Select one