Seven nonrandom data points that are still within the upper or lower control limit of a control chart are:
Select one
1782.
The team is working on a process improvement project for the organization. Similar projects have been completed in the past, although all of the team members on this project are new to the organization. The project manager has taken advantage of historical records from the previous projects, and is making use of templates and other documentation found in those records, management wants to look at how project is doing, as compared to past projects. To make a valid judgment, management should compare this project to:
Select one
1783.
The testing results for the new computer modulation project have arrived from the seller. The results indicate the project is not meeting the overall quality requirements. If the project manager meets with team members to analyze the situation, the project manager is involved in:
Select one
1784.
Which of the following best describes why quality is planned in and not inspected in?
Select one
1785.
During the completion of the project work. A project manager wants to ensure that the quality of the end product is acceptable. The best way to do this is by:
Select one
1786.
Which of the following methods is used to provide a standard to measure performance?
Select one
1787.
A project manager ¡s having problems with how two of the parts fit together on the new computer and the software uploads to the system. To plan a strategy for resolving these problems, it is best to determine if the problems are:
Select one
1788.
Which of the following would generally lead to the least amount of quality improvement?
Select one
1789.
Testing the entire population would
Select one
1790.
You are working for a medical device company. These products are strictly regulated, and the potential cost of litigation if defective equipment were to reach market is very high. In your new product development, you have completed the product design, and are testing a small initial production test run. The defect rate is higher than estimated. You are looking at several alternatives including changes in design, changes in policy, changes in procedures, and changes in standards. In order to determine if these changes would provide a positive result, you will start by using