A project manager estimates the work to be accomplished in the near term in detail at a low level of the Work Breakdown Structure (WBS). He estimates work far in the future as WBS components that are at a relatively high level of the WBS. What is this technique called?
Select one
Most project management software packages use a method of constructing a project schedule network diagram known as:
Select one
A hierarchical structure of project resources organized by category and resource type, used in planning, managing and controlling project work, is:
Select one
During a presentation to management, you want to display the project schedule with only the key deliverables displayed. What is the correct tool for this purpose?
Select one
Which of these is not an established Estimate Activity Durations technique?