2,934 New PMP Id 1028 project management is concerned with managing which type of project Questions & Answers with explanation
821.
Match the levels of stakeholder engagement with their descriptions.
Matching
Levels of Stakeholder Engagement | ||
Name | Description | |
Unaware
|
Stakeholders are not supportive of the project and may actively resist engaging.
|
|
Resistant
|
Stakeholders have positive expectations of the project and are supportive and engaged.
|
|
Neutral
|
Stakeholders are neutral, neither supporting nor resisting the project, and may be minimally engaged.
|
|
Supportive
|
Stakeholders are actively engaged in the project and helping to ensure its success.
|
|
Leading
|
Stakeholders are not engaged in the project.
|
822.
Match the conflict resolution technique with its synonym.
Matching
Categories of Project Influence | ||
Examples | Category | |
Accommodate
|
Reconcile
|
|
Withdraw
|
Avoid
|
|
Compromise
|
Direct
|
|
Collaborate
|
Problem solve
|
|
Force
|
Smooth
|
823.
Match the project ending with the corresponding description.
Matching
Types of Project Endings | ||
Type | Description | |
Integration
|
When resources are cut off from the project prior to completing all requirements
|
|
Starvation
|
When the project comes to an end because it was completed and accepted by the stakeholders
|
|
Addition
|
When resources are distributed to other areas in the organization or assigned to other projects
|
|
Extinction
|
When a project evolves into ongoing operations
|
824.
Match the project life cycle with its corresponding description of when planning occurs.
Matching
Term | Description | |
Predictive
|
Planning occurs early in the project’s life. The plan is modified through each iteration, and work completed informs future work.
|
|
Iterative
|
Most of the planning occurs upfront. The team strives to identify as much detail about requirements as possible early on.
|
|
Incremental
|
Teams plan one or more subsets of the overall project. Completion of these deliveries informs the future wor
|
825.
Match the PMO type with its corresponding description.
Matching
PMO Type | Description | |
Supportive
|
Serves in a management role. Assigns project managers to projects and directly manages projects
|
|
Controlling
|
Serves in a consultative role. Provides templates, best practices, training, and lessons learned from other projects
|
|
Directive
|
Serves in a supportive and compliance role. Provides project management and governance frameworks that are followed by PMs
|
826.
Match the term with its corresponding description.
Matching
Term | Description | |
Burnup chart
|
The total time it takes to deliver an item, measured from the time the work is committed to the time it is completed
|
|
Lead time
|
The time required to process a work item
|
|
Velocity
|
A measurement of the schedule efficiency expressed as a ratio of earned to planned value
|
|
Cycle time
|
A visual depiction of the work completed
|
|
Schedule performance index
|
The sum of story point sizes for the features completed in an iteration
|
827.
Match the project manager’s level of authority based on the organizational structure type.
Matching
Organizational Structure Type | Authority | |
Functional
|
High to almost total
|
|
Strong matrix
|
Low
|
|
Project-oriented
|
Little to none
|
|
Weak matrix
|
Moderate to high
|
828.
Match the term with its description.
Matching
Term | Description | |
Organizational process assets
|
Plans, processes, policies, procedures, and knowledge bases that are specific to and used by the performing organization
|
|
Enterprise environmental factors
|
Conditions, not under the immediate control of the team, that influence, constrain, or direct the project, program, or portfolio
|
829.
Match the type of PMO with its description.
Matching
PMO Type | Description | |
Supportive
|
Takes control of projects by directly managing them via project managers that report to the PMO
|
|
Controlling
|
Provides consultation to project teams by providing resources, training, and access to information
|
|
Directive
|
Provides support and requires compliance against published project management and governance frameworks
|
830.
The characteristics of project life cycles vary and should be considered when determining which life cycle is the best fit for a project. Match the delivery life cycle approach based on where it falls on the continuum when considering frequency of delivery and degree of change.
Matching
Life Cycle | Continuum | |
Predictive
|
High frequency of delivery and low degree of change
|
|
Iterative
|
Low frequency of delivery and high degree of change
|
|
Incremental
|
Low frequency of delivery and low degree of change
|
|
Agile
|
High frequency of delivery and high degree of change
|