2,936 New PMP Questions & Answers with explanation

1791.
Testing the entire population would
Select one
1792.
You are working for a medical device company. These products are strictly regulated, and the potential cost of litigation if defective equipment were to reach market is very high. In your new product development, you have completed the product design, and are testing a small initial production test run. The defect rate is higher than estimated. You are looking at several alternatives including changes in design, changes in policy, changes in procedures, and changes in standards. In order to determine if these changes would provide a positive result, you will start by using
Select one
1793.
A project manager has just taken over the project from another project manager during project executing. The previous project manager created a project budget, determined communications requirements, and went on to the complete work packages task. What should the new project manager do next?
Select one
1794.
A data point on a control chart that requires investigation is called
Select one
1795.
A project manager is gathering data with the team to determine how various factors might be linked to potential problems. In what part of the quality management process is the project manager working?
Select one
1796.
All the following are tools of control quality except:
Select one
1797.
Five of the seven phases on the project contain work that is substantically similar. What must the project manager do?
Select one
1798.
Which of the following is an output of the plan quality management process:
Select one
1799.
While testing the strength of concrete poured on your project. You discover that over 35 percent of the concrete does not meet your company`s quality standards. You feel certain the concrete will function as it is, and you don't think the concrete needs to meet the quality level specified. What should you do?
Select one
1800.
A project manager and team from a firm that designs railroad equipment are tasked to design a machine to load stone onto railroad cars. The design allows for 2 percent spillage, amounting to over two tons of spilled rock per day. In which of the following does the project manager document quality control, quality assurance and quality improvements for this project?
Select one