2,936 New PMP Questions & Answers with explanation

1811.
The upper and lower control limits in a control chart indicate the
Select one
1812.
The team had a difficult time developing a work breakdown structure for the project because they were faced with complex product requirements. In addition, they had to adhere to management-imposed time and cost constraints on the project. Now, the project manager and his team are using an ishikawa diagram, trying to determine how various factors might have contributed to project problems. The project manager is involved in which part of the quality management process
Select one
1813.
A project is in progress, and the project manager is working with the quality department to improve stakeholders' confidence that the project will satisfy the quality standards. Which of the following is an output of this process
Select one
1814.
To look backward at what may have contributed to quality problems on the project, the team may use which of the following?
Select one
1815.
A project manager is leading an effort to analyze waste and non-value-added activity on the project. One team member reports that two processes in use require work he believes is unnecessary. Another team member reports that a process is not well understood. The project manager must be leading which of the following?
Select one
1816.
During a team meeting, the team adds a specific area of extra work to the project because they have determined it would benefit the customer. What is wrong in this situation?
Select one
1817.
A project manager is worried about the costs on the project. There iss a lot of rework, and scrap and inventory costs are rising. If you were a mentor to this project manager, what is the best advice you could offer
Select one
1818.
If the probability of one event occurring does not affect the probability of another event occurring, the event are:
Select one
1819.
All of the following are inputs to the quality process except
Select one
1820.
A project team is in the design stage of a new mountain bicycle prototype. The team is in the process of identifying which type of frame and material will provide high performance at a low cost. Which of the following is the most likely technique used to determine these variables?
Select one