2,934 New PMP Questions & Answers with explanation

591.
You are a project manager for a manufacturing firm that produces Civil War–era replicas and memorabilia. You discover a design error during a test production run on your latest project. Time is a critical constraint on this project. The stakeholders are anxious to get this new product to market and their bonuses are on the line if this project doesn't come in on time. Which of the following is the most likely response to this problem?
Select one
592.
You are working on a project that was proceeding well until a manufacturing glitch occurred that requires corrective action. It turns out the glitch was an unintentional enhancement to the product, and the marketing people are absolutely crazy about its potential. The corrective action is canceled, and you continue to produce the product with the newly discovered enhancement. As the project manager, you know that a change has occurred to the product scope because the glitch changed the characteristics of the product. Which of the following statements is true?
Select one
593.
You are using a process to measure the quality results over time. You are reviewing this graphic at your status meeting and explain that this information is based on sample variance measurements. Your measurements are within two standard deviations. Which of the following options are true?
Select two
594.
All of the following are activities of the configuration management system except for which one?
Select one
595.
You are a project manager for Star Light Strings. Star Light manufactures strings of lights for outdoor display. Its products range from simple light strings to elaborate lights with animal designs, bug designs, memorabilia, and so on. Your newest project requires a change. One of the business unit managers submitted a change through the change control system, which utilizes a CCB. Which of the following is true regarding the CCB?
Select one
596.
You are a project manager for Star Light Strings. Star Light manufactures strings of lights for outdoor display. Its products range from simple light strings to elaborate lights with animal designs, bug designs, memorabilia, and so on. Your newest project requires a change. You are performing the Control Quality process and are looking at and testing a sampling of the product for conformance to quality standards. The tolerable result for the bulbs used on the string is 995–1,000 hours. All of the light bulbs must be LED bulbs. Which of the following are true regarding this process?
Select one
597.
Your project progressed as planned until yesterday. Suddenly, an unexpected risk event occurred. You quickly devised a response to deal with this negative risk event using which of the following?
Select one
598.
You are working on a project that was proceeding well until a manufacturing glitch occurred that requires corrective action. It turns out the glitch was an unintentional enhancement to the product, and the marketing people are absolutely crazy about its potential. The corrective action is canceled, and you continue to produce the product with the newly discovered enhancement. As the project manager, you know that a variance has occurred. Which of the following options is true?
Select one
599.
The Delphi method, technology forecasting, and forecast by analogy are examples of what category of forecasting methods?
Select one
600.
You are holding a regularly scheduled status meeting for your project. You know all of the following are true regarding status meetings except which one?
Select one