2021.
Mark is managing a telecom network deployment project. The buyer of the telecom network is an external entity. Recently, the customer requested that all future project updates be posted to their information system automatically. In order to implement this, the project team needs to customize their project management information system so it can be integrated with the customer’s information system. This is a new customer requirement that was not a part of the original project’s scope. What should the project manager do?
Select one
2022.
Variance analysis refers to cost performance measurements used to determine the magnitude of variation in comparison to the original cost baseline. What is the trend on the percentage range of acceptable variances as the project progresses?
Select one
2023.
Many organizations consider contract administration to be an administrative function separate from the project organization. Who carries out the function of contract administration in such organizations?
Select one
2024.
An experienced project manager was assigned a project of small scope. Which of the following could be true of the project?
Select one
2025.
A project was randomly selected for a quality audit, and the external auditor found various issues and nonconformance. The project manager lodged a complaint with the quality department that this was improper procedure, and he should have received notice since an external auditor was involved. What is your view?
Select one
2026.
A senior project manager advises a first-time project manager that identifying risks is just one step. On a continuing basis, new risks need to be identified, and existing risks need to be analyzed and tracked, and their status reported. All this is done as part of what process?
Select one
2027.
A project manager has decided to use a decision tree to do a build or upgrade analysis. The build requires an investment of $200M. On the build decision branch, there is a 60 percent probability of strong demand (yielding a revenue of $400M) and a 40 percent probability of weak demand (yielding a revenue of $150M). What is the expected monetary value (EMV) of the build?
Select one
2028.
Quality metrics used during the Control Quality process are defined during which process?
Select one
2029.
In order to keep costs low, a project management team decided to apply statistical sampling while inspecting some of the work products. They decided to select 10 out of 50 engineering drawings for inspection. During which process should the sample be collected?
Select one
2030.
A project manager prepared a presentation that included data on the project’s use of resources, improvements in staff efficiency, and the cost savings. These activities are part of what process?
Select one