The WBS represents all product and project work. The total work at the lowest levels should roll up to the higher levels so that nothing is left out and no extra work is performed. This principle is also the:
Select one
Which of the following is an example of a chart, used on agile projects, that tracks the work that remains to be completed in the iteration backlog?
Select one
Which of the following statements is correct:
Select one
Which of the following is an agile prototyping technique showing sequence or navigation through a series of images or illustrations:
Select one
Which of the following processes produces a work breakdown structure as an output?