237 New PMP Quality Questions & Answers with explanation

191.
Which process group corresponds to the “do” part of the plan-do-check-act cycle?
Select one
192.
A project manager creates a component-specific tool to verify that a set of required steps has been performed. This tool is called a:
Select one
193.
Ideally the relationship between a project manager and a business analyst should be:
Select one
194.
You are a project manager for an automotive parts company. Your organization was hired to produce clutches for an exotic car company. This will involve the design and production of custom clutches. During the course of the project, as you review a quality control statistics chart that examines every clutch produced for the month, you notice several cases where the spring component of the clutch is expanding with too much force and is falling outside the upper control limit. Which type of Quality Control tool are you most likely using?
Select one
195.
All of the following statements are true about the cause-and-effect diagram except:
Select one
196.
A project was randomly selected for a quality audit, and the external auditor found various issues and nonconformance. The project manager lodged a complaint with the quality department that this was improper procedure, and he should have received notice since an external auditor was involved. What is your view?
Select one
197.
Which of the following quality control tools and techniques may not be used for root cause analysis?
Select one
198.
Quality metrics used during the Control Quality process are defined during which process?
Select one
199.
In order to keep costs low, a project management team decided to apply statistical sampling while inspecting some of the work products. They decided to select 10 out of 50 engineering drawings for inspection. During which process should the sample be collected?
Select one
200.
Control charts are used to determine the stability of a process. Which of the following best describes the range of the control limits applied on a control chart?
Select one