New PMP Question & Answers with explanation
As an independent consultant, you are working with a project manager of a spacecraft parts manufacturing project to ensure that the team complies with organizational quality policies and procedures. Since parts made in this project must be of high precision and accuracy, you are documenting shortcomings within the processes and procedures to improve the quality for customer acceptance. Which of the following best represents the project management activity you are doing?
Select one
Cindy has been working in a manufacturing project as a project manager. This project is intended to produce high-quality semiconductors to use in computers. Since semiconductors are produced from silicon wafers, she contracted a company to provide silicon wafers to the project on an ongoing basis. For unknown reasons, the contractor provided low-quality wafers to the project, compromising the electrical performance of the semiconductors. Overwhelmed by complaints from the computer division, Cindy is now obligated to correct the manufacturing defects to avoid future liabilities. In this scenario, the costs Cindy incurred are:
Select one
Control charts are used to determine the stability of a process. Which of the following best describes the range of the control limits applied on a control chart?
Select one
Some tools or techniques can be used across various project processes to plan, execute, or control the characteristics of project elements. Which of the following is used as a tool in both the Control Quality and Plan Quality Management processes?
Select one
A project needed to monitor the technical performance of the project and capture data related to how many errors or defects had been identified and how many remained uncorrected. Which of the following techniques should the project use?
Select one