New PMP Question & Answers with explanation
From the project perspective, quality attributes
Select one
You are in the middle of a major new facility construction project. The structural steel is already in place, and the heating conduits are being put into place when a senior manager informs you that he is worried the project will not meet the quality standards. What should you do in this situation
Select one
A project manager needs to determine if the manufacturing process planned for the new micro-satellites will meet quality standards. Each satellite takes about three days to manufacture and costs u.s. $125.000. The satellites are so small that inspection would destroy them. Under these circumstances, what should the project manager do?
Select one
The upper and lower control limits in a control chart indicate the
Select one
The team had a difficult time developing a work breakdown structure for the project because they were faced with complex product requirements. In addition, they had to adhere to management-imposed time and cost constraints on the project. Now, the project manager and his team are using an ishikawa diagram, trying to determine how various factors might have contributed to project problems. The project manager is involved in which part of the quality management process
Select one