New PMP Question & Answers with explanation

Work on a project is ongoing when the project manager overhears two workers arguing over what a set of instructions mean. The project manager investigates and discovers that the instructions for the construction of the concrete footings currently being poured were poorly translated between the different languages in use on the project. Which of the following is the best thing for the project manager to do first?
Select one
The widget production project ¡s well underway. The requirements are clear that each widget must weigh between 0.320 and 0.325 ounces. The first day of test production resulted in 1247 widgets. Of the widgets inspected, 47 percent fell within the acceptable weight range. This is an example of?
Select one
Quality on your project must be as high as possible. Yet this type of project is new for your company. Which of the following is the best thing to do?
Select one
A quality management plan ¡s created during:
Select one
A control chart shows seven data points in a row on one side of the mean. What should be done?
Select one