New PMP Question & Answers with explanation
Al is a lead testing manager, and Veronica is a development manager; both work for Power Cloud Stock Trading Online in the same team. They are requesting a meeting with the project manager because every milestone that has been set for the project seems to have a conflict, resulting from conflict between two specific team members. Who is responsible for resolving conflict between the two project team members?
Select one
Joy is the technical lead of the testing department at Bing Bonk software. After she brings an issue to the attention of the CEO of the company, the CEO instructs Joy to tell the project manager to increase the duration of the testing phase by two weeks as a means of guaranteeing their upcoming release has no defects. Which of the following types of power is based on the respect that others have for someone else?
Select one
Rita is a product owner responsible for the company’s line of smart digital music devices. During a strategy session, she speaks with the division president regarding a new product idea. Based on the recent analysis and voice of the customer data obtained, they decide to move forward with the development of a minimum viable product (MVP). Which of the following best defines MVP?
Select one
Match the project life cycle with its corresponding goal.
Matching
Project Life Cycles | ||
Type | Description | |
Predictive
|
Correctness of solution
|
|
Iterative
|
Customer value via frequent deliveries and feedback
|
|
Incremental
|
Speed
|
|
Agile
|
Manage cost
|
Who developed the 14 Steps to Quality Management?
Select one