New PMP Question & Answers with explanation
Sheila is the project manager of a website development project. After a detailed discussion with the project management team, she decides to create an informal, broadly framed quality management plan. What would your comment on this be?
Select one
During a discussion with the quality department, Dave, a project manager, was told that as applied to projects, the terms “prevention” and “inspection” are synonymous. However, his understanding of the terms is different. What would you comment on this situation?
Select one
In order to keep costs low, a project management team decided to apply statistical sampling while inspecting some of the work products. They decided to select 10 out of 50 engineering drawings for inspection. During which process should the sample be collected?
Select one
Quality metrics used during the Control Quality process are defined during which process?
Select one
A project involved development of a high-speed, hard disk drive. As part of its testing, the hard disk was subjected to continuous operation at a high speed and an elevated temperature. At the end of the test, the hard disk was destroyed beyond use. The cost of such testing is usually classified as:
Select one